Pantheon

GE Vernova

GE 9HA.02 H-Class Gas Turbine — 470–571 MW, 838 MW Combined Cycle

GE 9HA.02 50 Hz H-class gas turbine for sale — 571 MW simple cycle at 44.0% in GE’s current rating, and about 838 MW in a single-shaft combined cycle.

Available
GE Vernova
Heavy-duty
HA-class
Baseload
Lead time: On requestRequest a quote →

GE 9HA.02 heavy-duty gas turbine available through Pantheon. The 9HA.02 is the larger of GE’s two 50 Hz H-class frames, and its rating has risen with each design update: 470 MW at its 2014 launch, 557 MW at 44% by 2018 and 571 MW at 44.0% (7,740 Btu/kWh) on GE’s current fact sheet. In a one-turbine combined cycle GE rates it at 838 MW and 64.1%. The smaller 9HA.01 is rated 448 MW simple cycle. Which rating applies depends on the unit’s build standard. Exact rating and configuration confirmed at quote.

Specifications

TypeHeavy-duty gas turbine (single-shaft, H-class)
Output (simple cycle)571 MW current rating · 557 MW (2018) · 470 MW (2014 launch)
Efficiency (simple cycle)44.0% (7,740 Btu/kWh) current · 44% (2018)
Combined cycle (1×1)838 MW at 64.1% current · 826 MW (2018) · 701 MW (2014)
Frequency50 Hz
9HA family9HA.01 448 MW simple cycle at 42.9% · 680 MW combined cycle

Specifications shown are headline figures. Confirm full configuration details when you request a quote.

Last updated

Request a quote for GE 9HA.02 Gas Turbine

Tell us your requirements and we'll get back to you with availability and pricing.

or reach us directly at