Pantheon

GE Vernova

GE Frame 7B and 7BE Uprate Heavy-Duty Gas Turbine — 52–70.5 MW (MS7001B)

Refurbished GE Frame 7B (MS7001B) heavy-duty gas turbine for sale, including units uprated to 7BE with 7EA hot-gas-path parts — 60–70.5 MW at 60 Hz.

Pre-order
GE Vernova
Heavy-duty
Baseload
Dual-fuel
Condition: Refurbished. Lead time: Q4 2027 – Q1 2028.Request a quote →

Refurbished GE Frame 7B heavy-duty gas turbine available through Pantheon. The MS7001B was GE’s 60 Hz frame of the 1970s: 51.8 MW at first rating, then 60.0 MW (PG7821B) and 61.75 MW (PG7851B) at about 10,900–11,000 Btu/kWh, single-shaft at 3,600 rpm. The 7BE uprate (GE’s MS7001B/E, code FT5X) fits current 7EA hot-gas-path parts and a reduced-camber inlet guide vane set to a 7B, raising firing temperature from 1,840 °F to as much as 2,020 °F. GE publishes four uprate options at 60.9, 63.5, 67.1 and 70.5 MW ISO on natural gas, an output gain of 6.6% to 23.6%. Exact rating, uprate option, and configuration confirmed at quote.

Specifications

TypeHeavy-duty gas turbine (single-shaft)
Output, 7B51.8 MW (PG7711B) · 60.0 MW (PG7821B) · 61.75 MW (PG7851B)
Output, 7BE uprate60.9 / 63.5 / 67.1 / 70.5 MW ISO, natural gas (uprate options 1–4)
Heat rate~10,900–11,100 Btu/kWh
7BE uprate scope7EA hot-gas-path parts · reduced-camber IGVs · firing temperature 1,840 → up to 2,020 °F
Frequency60 Hz · 3,600 rpm
FuelNatural gas · distillate
ConditionRefurbished

Specifications shown are headline figures. Confirm full configuration details when you request a quote.

Last updated

Request a quote for GE Frame 7B and 7BE (MS7001B) Gas Turbine

Tell us your requirements and we'll get back to you with availability and pricing.

or reach us directly at