Pantheon

GE Vernova

GE LM2500XPRESS Aeroderivative Gas Turbine — 34–37 MW (+G4 and +G5)

GE LM2500XPRESS modular aeroderivative gas turbine for sale — a factory-built LM2500+G4 or +G5 DLE package of 34–37 MW, installed in about two weeks.

Available
GE Vernova
Aeroderivative
LM2500-class
Fast-start
Lead time: On requestRequest a quote →

GE LM2500XPRESS aeroderivative gas turbine available through Pantheon. It is GE’s modular package of the LM2500+G4 or LM2500+G5 with dry low emissions combustion, up to 95% assembled in the factory and shipped in ten modules with 27 electrical interconnects instead of more than 130. GE quotes installation in about 14 days by a crew of 20 and a five-minute fast start. The +G4 is rated 34.5 MW net at 50 Hz and 34.4 MW at 60 Hz, at 39.4% and 39.8% efficiency. The +G5 is rated up to 36.3 and 36.8 MW at 25 ppm NOx, or 33.9 and 34.5 MW at 15 ppm. In combined cycle GE rates about 52 MW for one turbine and over 104 MW for two. Exact rating and configuration confirmed at quote.

Specifications

TypeAeroderivative gas turbine (modular LM2500+G4 / +G5 package)
Output, +G434.5 MW net (50 Hz) · 34.4 MW net (60 Hz)
Output, +G536.3 / 36.8 MW at 25 ppm NOx · 33.9 / 34.5 MW at 15 ppm (50 / 60 Hz)
Efficiency39.4–39.8% (+G4, 8,563–8,669 Btu/kWh) · 38.9–39.5% (+G5)
CombustionDLE (dry low emissions)
PackagingUp to 95% factory-assembled · 10 modules · 27 electrical interconnects
Installation~14 days with a crew of 20 (GE)
Start timeFast start in 5 minutes
Combined cycle~52 MW (1×1) · >104 MW (2×1)
Frequency50/60 Hz

Specifications shown are headline figures. Confirm full configuration details when you request a quote.

Last updated

Request a quote for GE LM2500XPRESS Aeroderivative Gas Turbine

Tell us your requirements and we'll get back to you with availability and pricing.

or reach us directly at