Pantheon

GE Vernova

GE LM6000 PC (SAC) Aeroderivative Gas Turbine — 46.5–48 MW

Used and surplus GE LM6000 PC SAC aeroderivative gas turbines for sale — the base ~48 MW non-intercooled PC, including an engine fresh from a full Level 4 module-by-module overhaul with zero hours since.

Available
GE Vernova
Aeroderivative
LM6000-class
Fast-start
Dual-fuel
Condition: Used and surplus. Lead time: from Q1–Q2 2027 (3–6 mo as-is · 8–12 mo refurbished + 60 Hz).Request a quote →

Used and surplus GE LM6000 PC aeroderivative gas turbines with Single Annular Combustor (SAC) available for sale through Pantheon — the ~46.5–48 MW base PC without SPRINT, so hot-day output sits below the intercooled variant and a SPRINT retrofit can be quoted where a matched fleet is wanted. The lead lot is an engine that has completed a full Level 4 overhaul on every module at a GE-network facility — inlet guide vanes, low- and high-pressure compressors, frames, gearboxes, combustor, high-pressure turbine rotor and both nozzle stages, low-pressure turbine and rear frame — with each module tracked by part number in and out, several returned on upgraded configurations. It was performance-tested and accepted to OEM procedures, carries zero hours since overhaul, and is documented by a ~200-page shop-visit report — incoming and outgoing photographs, module findings, service-bulletin schedule and test report — plus an OEM completion letter and OEM warranty. That overhaul was the engine’s first shop visit after 50,000–55,000 hours and 4,000–5,000 starts on original hardware; its frame and package are offered separately, with reuniting the two a defined scope item. A second lot is a 2002–2005 unit at 60,000–65,000 hours under the same preservation regime (periodic hydraulic cranking, site assessment with photographs). Note that on exchanged engines the headline hours describe the package, not the engine inside it — we state the engine figure wherever we hold it. As-is or refurbished-with-60 Hz-conversion routes, with deliveries staged from Q1–Q2 2027. Exact rating, hours, and configuration confirmed at quote.

Specifications

TypeAeroderivative gas turbine (LM6000 PC, twin-spool)
Output (simple cycle)~46.5–48 MW ISO (non-SPRINT)
Efficiency (simple cycle)~41%
CombustorSAC (single annular) · water/steam injection for NOx
FrequencyAs-is at current site frequency · 60 Hz conversion included in refurbished scope
FuelNatural gas · dual-fuel capable
Start timeFast-start (~10 minutes)
Vintage range2002–2009
Operating hoursZero hours since full Level 4 overhaul (lead lot) · 60,000–65,000 package hours (second lot)
Overhaul documentation~200-page shop-visit report · OEM test acceptance within the last 12 months · OEM completion letter · OEM warranty
Scope optionsAs-is · or refurbished (bearings, gearboxes, controls, BOP) + 60 Hz conversion · SPRINT retrofit quotable
DeliveryStaged from Q1–Q2 2027 · as-is ~3–6 months · refurbished + conversion ~8–12 months
Offer windowLot listed through 2026-12-31 · availability re-confirmed at quote
ConditionUsed and surplus · one engine freshly overhauled, zero hours since

Specifications shown are headline figures. Confirm full configuration details when you request a quote.

Last updated

Request a quote for GE LM6000 PC SAC Aeroderivative Gas Turbine

Tell us your requirements and we'll get back to you with availability and pricing.

or reach us directly at