GE Vernova TM2500 Mobile Gas Turbine

Trailer-mounted aeroderivative gas turbine generator package for fast, dispatchable power — based on the proven LM2500, deployable in days and at full power in minutes.

Available
Lead time: ≈3 monthsRequest a quote →

The TM2500 is a mobile, trailer-mounted aeroderivative gas-turbine generator package built on GE’s LM2500 heritage. It is designed for rapid deployment — installation in roughly two weeks and full power in about ten minutes — making it a common choice for emergency, bridging, and grid-stability power. Runs on a range of fuels and scales in blocks as demand grows. Exact unit rating, generation, and fuel configuration confirmed at quote.

Specifications

TypeAeroderivative gas turbine (LM2500 heritage)
ConfigurationMobile / trailer-mounted generator package
Output≈22–34 MW (model & site dependent)
EfficiencyUp to ~40% (DLE)
FuelMulti-fuel — natural gas, LPG and/or distillate liquid
Start timeFull power in ~10 minutes
DeploymentInstall in ~14 days · scales in blocks as demand grows
ConditionAvailable — generation/config confirmed at quote

Specifications shown are headline figures. Confirm full configuration details when you request a quote.

Last updated

Request a quote for GE Vernova TM2500 Mobile Gas Turbine

Tell us your requirements and we'll get back to you with availability and pricing.

or reach us directly at