GE Vernova
GE Vernova TM2500 Mobile Gas Turbine
Trailer-mounted aeroderivative gas turbine generator package for fast, dispatchable power — based on the proven LM2500, deployable in days and at full power in minutes.
The TM2500 is a mobile, trailer-mounted aeroderivative gas-turbine generator package built on GE’s LM2500 heritage. It is designed for rapid deployment — installation in roughly two weeks and full power in about ten minutes — making it a common choice for emergency, bridging, and grid-stability power. Runs on a range of fuels and scales in blocks as demand grows. Exact unit rating, generation, and fuel configuration confirmed at quote.
Specifications
| Type | Aeroderivative gas turbine (LM2500 heritage) |
|---|---|
| Configuration | Mobile / trailer-mounted generator package |
| Output | ≈22–34 MW (model & site dependent) |
| Efficiency | Up to ~40% (DLE) |
| Fuel | Multi-fuel — natural gas, LPG and/or distillate liquid |
| Start time | Full power in ~10 minutes |
| Deployment | Install in ~14 days · scales in blocks as demand grows |
| Condition | Available — generation/config confirmed at quote |
Specifications shown are headline figures. Confirm full configuration details when you request a quote.
Last updated
Request a quote for GE Vernova TM2500 Mobile Gas Turbine
Tell us your requirements and we'll get back to you with availability and pricing.
or reach us directly at