Pantheon

GE Vernova

GE LM6000 PC SPRINT (SAC) Aeroderivative Gas Turbine — 46–48.4 MW

Used and surplus GE LM6000 PC SPRINT SAC aeroderivative gas turbines for sale — the spray-intercooled ~46–48 MW hot-day variant, offered singly or as a matched block, on an as-is or refurbished-with-60 Hz-conversion basis.

Available
GE Vernova
Aeroderivative
LM6000-class
Fast-start
Dual-fuel
Condition: Used and surplus. Lead time: from Q1–Q2 2027 (3–6 mo as-is · 8–12 mo refurbished + 60 Hz).Request a quote →

Used and surplus GE LM6000 PC SPRINT aeroderivative gas turbines with Single Annular Combustor (SAC) available for sale through Pantheon. The PC is the ~48 MW ISO member of the LM6000 family and SPRINT spray intercooling holds that output on hot days, where a non-intercooled unit would derate. Current lots span 2001–2013 vintages with package hours from roughly 15,000 to 75,000, held under a common lay-up regime: periodic hydraulic cranking to rotate each unit to cranking speed, with site technical assessments and photographs on file and pre-delivery borescopes available on request. Several units are of the same vintage and build, which suits a buyer wanting a uniform fleet with common spares and one training and maintenance program. Two routes are offered — buy as-is and control the refurbishment yourself, or take the units fully refurbished (bearings, gearboxes, controls, balance of plant) with conversion to 60 Hz included. Deliveries are staged from Q1–Q2 2027 and can be phased to a build schedule; remaining-interval figures on stored units are operator estimates rather than measurements, so a borescope before commitment is recommended and can be arranged. Exact rating, hours, and configuration confirmed at quote.

Specifications

TypeAeroderivative gas turbine (LM6000 PC, twin-spool)
Output (simple cycle)~46–48.4 MW ISO with SPRINT
Efficiency (simple cycle)~41%
SPRINTSpray intercooling · holds rated output on hot days
CombustorSAC (single annular) · water/steam injection for NOx
FrequencyAs-is at current site frequency · 60 Hz conversion included in refurbished scope
FuelNatural gas · dual-fuel capable
Start timeFast-start (~10 minutes)
Vintage range2001–2013
Operating hours~15,000–75,000 package hours, varies by unit
PreservationPeriodic hydraulic cranking during lay-up · site assessments with photographs
Scope optionsAs-is · or refurbished (bearings, gearboxes, controls, BOP) + 60 Hz conversion
DeliveryStaged from Q1–Q2 2027 · as-is ~3–6 months · refurbished + conversion ~8–12 months
Offer windowLot listed through 2026-12-31 · availability re-confirmed at quote
ConditionUsed and surplus · as-is or refurbished with 60 Hz conversion

Specifications shown are headline figures. Confirm full configuration details when you request a quote.

Last updated

Request a quote for GE LM6000 PC SPRINT SAC Aeroderivative Gas Turbine

Tell us your requirements and we'll get back to you with availability and pricing.

or reach us directly at