GE Vernova
GE LM6000 PC SPRINT (SAC) Aeroderivative Gas Turbine — 46–48.4 MW
Used and surplus GE LM6000 PC SPRINT SAC aeroderivative gas turbines for sale — the spray-intercooled ~46–48 MW hot-day variant, offered singly or as a matched block, on an as-is or refurbished-with-60 Hz-conversion basis.
Used and surplus GE LM6000 PC SPRINT aeroderivative gas turbines with Single Annular Combustor (SAC) available for sale through Pantheon. The PC is the ~48 MW ISO member of the LM6000 family and SPRINT spray intercooling holds that output on hot days, where a non-intercooled unit would derate. Current lots span 2001–2013 vintages with package hours from roughly 15,000 to 75,000, held under a common lay-up regime: periodic hydraulic cranking to rotate each unit to cranking speed, with site technical assessments and photographs on file and pre-delivery borescopes available on request. Several units are of the same vintage and build, which suits a buyer wanting a uniform fleet with common spares and one training and maintenance program. Two routes are offered — buy as-is and control the refurbishment yourself, or take the units fully refurbished (bearings, gearboxes, controls, balance of plant) with conversion to 60 Hz included. Deliveries are staged from Q1–Q2 2027 and can be phased to a build schedule; remaining-interval figures on stored units are operator estimates rather than measurements, so a borescope before commitment is recommended and can be arranged. Exact rating, hours, and configuration confirmed at quote.
Specifications
| Type | Aeroderivative gas turbine (LM6000 PC, twin-spool) |
|---|---|
| Output (simple cycle) | ~46–48.4 MW ISO with SPRINT |
| Efficiency (simple cycle) | ~41% |
| SPRINT | Spray intercooling · holds rated output on hot days |
| Combustor | SAC (single annular) · water/steam injection for NOx |
| Frequency | As-is at current site frequency · 60 Hz conversion included in refurbished scope |
| Fuel | Natural gas · dual-fuel capable |
| Start time | Fast-start (~10 minutes) |
| Vintage range | 2001–2013 |
| Operating hours | ~15,000–75,000 package hours, varies by unit |
| Preservation | Periodic hydraulic cranking during lay-up · site assessments with photographs |
| Scope options | As-is · or refurbished (bearings, gearboxes, controls, BOP) + 60 Hz conversion |
| Delivery | Staged from Q1–Q2 2027 · as-is ~3–6 months · refurbished + conversion ~8–12 months |
| Offer window | Lot listed through 2026-12-31 · availability re-confirmed at quote |
| Condition | Used and surplus · as-is or refurbished with 60 Hz conversion |
Specifications shown are headline figures. Confirm full configuration details when you request a quote.
Last updated
Request a quote for GE LM6000 PC SPRINT SAC Aeroderivative Gas Turbine
Tell us your requirements and we'll get back to you with availability and pricing.
or reach us directly at